Skip to main content

BuilD68

BuilD68

Getting Ready to Paint!
Handprints of The Future
Aerial 1
Aerial 2

Current Projects

  •  

    • Geothermal field drilling (HVAC) 
    • Installation of new:
      • Construction site interior with exposed beams, concrete walls, and window frames.Sewer lines
      • Storm water
      • Water service
      • Facility house pump
    • Site excavation work included
      • Addition foundation
      • Removal of parking lot
      • Removal of fencing
    • Site Improvement work included:
      • Framed and installed
      • new curbs and islands
      • HLS violation corrections /improvements

Completed Projects

    • Generator Pow
    • Gym floor renovations
    • Gym backboards and wall pads
    • Painting of ceiling and walls
    • Painting and seal of floor lines and logo
    • New roof
    • New Siding
    • Removal of existing outdated univent HVAC system 
    • Installation of new geothermal HVAC system 
    • New light fixtures 
    • New ceiling tiles 
    • New BAS light controls 
    • New BAS HVAC controls 
    • Gym air conditioning 
    • New casework / cabinets 
    • Masonry repairs to existing univent luvers 
    • Site drainage repairs 
    • New science classroom 
    • New art room flooring 
    • HLS violation corrections / improvements
    • Generator Power
    • Gym floor renovations
    • Gym backboards and wall pads
    • Painting of ceiling and walls
    • Painting and seal of floor lines and logo
    • Removal of existing outdated univent HVAC system 
    • Installation of new geothermal HVAC system 
    • New light fixtures 
    • New ceiling tiles 
    • New BAS light controls 
    • New BAS HVAC controls 
    • Gym air conditioning
    • Kindergarten lockers  
    • New casework / cabinets 
    • Masonry repairs to existing univent luvers 
    • Site drainage repairs 
    • New science classroom 
    • New art room flooring 
    • HLS violation corrections / improvements
    • Generator Powe
    • New roof
    • New Siding
    • Removal of existing outdated univent HVAC units 
    • Installation of new univent HVAC units  
    • New light fixtures 
    • New ceiling tiles 
    • New BAS light controls  
    • Gym air conditioning
    • New staff restrooms   
    • New casework / cabinets 
    • Masonry repairs to existing univent luvers 
    • Site drainage repairs 
    • New science classroom 
    • New art room flooring 
    • HLS violation corrections / improvements
    • Gym floor renovations
    • Gym backboards and wall pads
    • Painting of ceiling and walls
    • Painting and seal of floor lines and logo
    • New Flooring 
    • Corridor renovations & painting w/ new classroom entrances 
    • HVAC upgrades to the Gymnasium 
    • New lights 
    • New ceiling tiles 
    • Cafeteria renovations 
    • Generator Power
    • Gym floor renovations
    • Gym backboards and wall pads
    • Painting of ceiling and walls
    • Painting and seal of floor lines and logo
    • New scoreboards
    • New bleachers
    • New Chillers